{"id":3776,"date":"2019-02-06T14:42:34","date_gmt":"2019-02-06T13:42:34","guid":{"rendered":"https://soclema.com/?p=3776"},"modified":"2019-02-06T14:44:15","modified_gmt":"2019-02-06T13:44:15","slug":"soclema-participe-a-phase-pilote-projet-tulipe","status":"publish","type":"post","link":"https://soclema.com/les-actualites/2019/02/06/soclema-participe-a-phase-pilote-projet-tulipe/","title":{"rendered":"SOCLEMA participe à la phase pilote du Projet TULIPE"},"content":{"rendered":"<p>SOCLEMA is involved in the pilot phase of the TULIPE project to <b>convert B gas to H gas</b> in the Grande Synthe - Dunkerque (59) area.<br/>\nIt is contributing its<b> sampling </b>and<b> injection</b> <b>expertise</b> to the network adaptation work, and will supply equipment for the<b> Brouckerque</b><b>analysis</b> and<b>injection</b> stations.</p>\n<p>&nbsp;</p>\n<h3><b>The TULIPE project</b></h3>\n<p>The Hauts-de-France region is mainly supplied with \"B gas\" from the Netherlands, in particular from the Groningen field, which is now at the end of its life.</p>\n<p>B gas accounts for around 10% of total French consumption and 1.3 million customers. The associated supply contracts will not be renewed, and imports of B gas into France will cease in 2029. By then, all transmission and distribution networks will have to be converted to carry H gas, which has a higher calorific value.</p>\n<p>This is the <b>aim of the TULIPE project to convert B gas to H gas</b>.</p>\n<p>The conversion of the current B-gas consumption zone to H-gas is based on a division of the B-gas transmission and distribution networks into some twenty geographical sectors. The change in the type of gas delivered will be carried out independently and successively in each sector, enabling a gradual conversion up to 2029 at the latest.</p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-3779\" src=\"https://soclema.com/wp-content/uploads/2019/01/soclema_grtgaz_Projet_TULIPE_Carte-conversion-secteurs-400x393.jpg\" alt=\"soclema_grtgaz_Projet_TULIPE_Carte conversion secteurs\" width=\"400\" height=\"393\" srcset=\"https://soclema.com/les-actualites/wp-content/uploads/2019/01/soclema_grtgaz_Projet_TULIPE_Carte-conversion-secteurs-400x393.jpg 400w, https://soclema.com/les-actualites/wp-content/uploads/2019/01/soclema_grtgaz_Projet_TULIPE_Carte-conversion-secteurs.jpg 545w\" sizes=\"auto, (max-width: 400px) 100vw, 400px\"></p>\n<p>The composition of natural gas varies according to its origin, and influences its energy content: the higher the nitrogen content of natural gas, the lower its calorific value.<br/>\n- <strong>B\" gas</strong> (low calorific value), mainly from Groningen, contains a higher nitrogen content.<br/>\n- <strong>H\" gas</strong> (high calorific value), from the North Sea, Russia and Algeria, supplies the rest of the country.</p>\n<p>The project is essential to ensure continuity of supply for B gas consumers. It will go further by improving the security of gas supply to this part of the network, which is currently supplied by a single entry point and a single source of supply at Taisnières. The project will create new connections with the rest of the transmission network and provide access to diversified sources of H-gas.</p>\n<p>The project will also improve transport efficiency. As the energy content of H-gas is higher than that of L-gas, the volumes of gas to be transported will be lower for the same end use. Energy consumption associated with transport on this part of the network should therefore be reduced.</p>\n<h6><em>Source: GRTgaz</em><br/>\n<em> http://www.grtgaz.com/grands-projets/le-projet-tulipe/presentation/actualites/projet-tulipe</em><br/>\n<em> GRTgaz's ten-year transmission system development plan 2017-2026</em></h6>\n","protected":false},"excerpt":{"rendered":"<p>SOCLEMA is involved in the pilot phase of the TULIPE project to convert L-gas to H-gas in the Grande Synthe - Dunkerque (59) area. SOCLEMA is providing sampling and injection expertise for the network adaptation work, and will supply equipment for the analysis station and the [...] injection station.</p>\n","protected":false},"author":5,"featured_media":3777,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2],"tags":[],"class_list":["post-3776","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.7 - https://yoast.com/wordpress/plugins/seo/ -->\n<title>SOCLEMA takes part in the pilot phase of the TULIPE Project - Soclema</title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\">\n<link rel=\"canonical\" href=\"https://soclema.com/en/news/2019/02/06/soclema-participates-in-pilot-phase-of-tulip-project/\">\n<meta property=\"og:locale\" content=\"fr_FR\">\n<meta property=\"og:type\" content=\"article\">\n<meta property=\"og:title\" content=\"SOCLEMA takes part in the pilot phase of the TULIPE Project - Soclema\">\n<meta property=\"og:description\" content=\"SOCLEMA is involved in the pilot phase of the TULIPE project to convert L-gas to H-gas in the Grande Synthe - Dunkerque (59) area. SOCLEMA is providing sampling and injection expertise for the network adaptation work, and will supply equipment for the analysis station and the [...] injection station.\">\n<meta property=\"og:url\" content=\"https://soclema.com/en/news/2019/02/06/soclema-participates-in-pilot-phase-of-tulip-project/\">\n<meta property=\"og:site_name\" content=\"Soclema\">\n<meta property=\"article:published_time\" content=\"2019-02-06T13:42:34+00:00\">\n<meta property=\"article:modified_time\" content=\"2019-02-06T13:44:15+00:00\">\n<meta property=\"og:image\" content=\"https://soclema.com/les-actualites/wp-content/uploads/2019/01/soclema_grtgaz_Station-pilote_Projet_TULIPE_Brouckerque-e1548326062358.jpg\">\n\t<meta property=\"og:image:width\" content=\"250\">\n\t<meta property=\"og:image:height\" content=\"277\">\n\t<meta property=\"og:image:type\" content=\"image/jpeg\">\n<meta name=\"author\" content=\"Fabienne Frontière\">\n<meta name=\"twitter:card\" content=\"summary_large_image\">\n<meta name=\"twitter:label1\" content=\"Écrit par\">\n\t<meta name=\"twitter:data1\" content=\"Fabienne Frontière\">\n\t<meta name=\"twitter:label2\" content=\"Durée de lecture estimée\">\n\t<meta name=\"twitter:data2\" content=\"2 minutes\">\n<script type=\"application/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https://schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https://soclema.com/en/news/2019/02/06/soclema-participates-in-pilot-phase-of-tulip-project/#article\",\"isPartOf\":{\"@id\":\"https://soclema.com/en/news/2019/02/06/soclema-participates-in-pilot-phase-of-tulip-project/\"},\"author\":{\"name\":\"Fabienne Frontière\",\"@id\":\"https://soclema.com/en/news/#/schema/person/e458f2d36ae1a6f21885f76b85591d45\"},\"headline\":\"SOCLEMA participe à la phase pilote du Projet TULIPE\",\"datePublished\":\"2019-02-06T13:42:34+00:00\",\"dateModified\":\"2019-02-06T13:44:15+00:00\",\"mainEntityOfPage\":{\"@id\":\"https://soclema.com/en/news/2019/02/06/soclema-participates-in-pilot-phase-of-tulip-project/\"},\"wordCount\":485,\"commentCount\":0,\"image\":{\"@id\":\"https://soclema.com/en/news/2019/02/06/soclema-participates-in-pilot-phase-of-tulip-project/#primaryimage\"},\"thumbnailUrl\":\"https://soclema.com/les-actualites/wp-content/uploads/2019/01/soclema_grtgaz_Station-pilote_Projet_TULIPE_Brouckerque-e1548326062358.jpg\",\"articleSection\":[\"Blog\"],\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https://soclema.com/en/news/2019/02/06/soclema-participates-in-pilot-phase-of-tulip-project/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https://soclema.com/en/news/2019/02/06/soclema-participates-in-pilot-phase-of-tulip-project/\",\"url\":\"https://soclema.com/en/news/2019/02/06/soclema-participates-in-pilot-phase-of-tulip-project/\",\"name\":\"SOCLEMA participe à la phase pilote du Projet TULIPE - Soclema\",\"isPartOf\":{\"@id\":\"https://soclema.com/en/news/#website\"},\"primaryImageOfPage\":{\"@id\":\"https://soclema.com/en/news/2019/02/06/soclema-participates-in-pilot-phase-of-tulip-project/#primaryimage\"},\"image\":{\"@id\":\"https://soclema.com/en/news/2019/02/06/soclema-participates-in-pilot-phase-of-tulip-project/#primaryimage\"},\"thumbnailUrl\":\"https://soclema.com/les-actualites/wp-content/uploads/2019/01/soclema_grtgaz_Station-pilote_Projet_TULIPE_Brouckerque-e1548326062358.jpg\",\"datePublished\":\"2019-02-06T13:42:34+00:00\",\"dateModified\":\"2019-02-06T13:44:15+00:00\",\"author\":{\"@id\":\"https://soclema.com/en/news/#/schema/person/e458f2d36ae1a6f21885f76b85591d45\"},\"breadcrumb\":{\"@id\":\"https://soclema.com/en/news/2019/02/06/soclema-participates-in-pilot-phase-of-tulip-project/#breadcrumb\"},\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https://soclema.com/en/news/2019/02/06/soclema-participates-in-pilot-phase-of-tulip-project/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https://soclema.com/en/news/2019/02/06/soclema-participates-in-pilot-phase-of-tulip-project/#primaryimage\",\"url\":\"https://soclema.com/les-actualites/wp-content/uploads/2019/01/soclema_grtgaz_Station-pilote_Projet_TULIPE_Brouckerque-e1548326062358.jpg\",\"contentUrl\":\"https://soclema.com/les-actualites/wp-content/uploads/2019/01/soclema_grtgaz_Station-pilote_Projet_TULIPE_Brouckerque-e1548326062358.jpg\",\"width\":250,\"height\":277,\"caption\":\"soclema_grtgaz_Station pilote_Projet_TULIPE_Brouckerque\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https://soclema.com/en/news/2019/02/06/soclema-participates-in-pilot-phase-of-tulip-project/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Accueil\",\"item\":\"https://soclema.com/en/news/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"SOCLEMA participe à la phase pilote du Projet TULIPE\"}]},{\"@type\":\"WebSite\",\"@id\":\"https://soclema.com/en/news/#website\",\"url\":\"https://soclema.com/en/news/\",\"name\":\"Soclema\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https://soclema.com/en/news/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-FR\"},{\"@type\":\"Person\",\"@id\":\"https://soclema.com/en/news/#/schema/person/e458f2d36ae1a6f21885f76b85591d45\",\"name\":\"Fabienne Frontière\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https://soclema.com/en/news/#/schema/person/image/\",\"url\":\"https://secure.gravatar.com/avatar/d6f5f28870cbf2756828e2f532ee86ee08af743eda5b6911ab9abe2d788a97ed?s=96&d=mm&r=g\",\"contentUrl\":\"https://secure.gravatar.com/avatar/d6f5f28870cbf2756828e2f532ee86ee08af743eda5b6911ab9abe2d788a97ed?s=96&d=mm&r=g\",\"caption\":\"Fabienne Frontière\"}}]}</script>\n<!-- / Yoast SEO plugin. -->","yoast_head_json":{"title":"SOCLEMA takes part in the pilot phase of the TULIPE Project - Soclema","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https://soclema.com/les-actualites/2019/02/06/soclema-participe-a-phase-pilote-projet-tulipe/","og_locale":"fr_FR","og_type":"article","og_title":"SOCLEMA participe à la phase pilote du Projet TULIPE - Soclema","og_description":"SOCLEMA est présente sur la phase pilote du projet TULIPE de conversion de gaz B au gaz H sur le secteur de Grande Synthe &#8211; Dunkerque (59). Elle apporte son expertise en échantillonnage et en injection sur les travaux d&#8217;adaptation du réseau et fournira du matériel pour le poste d&#8217;analyse et le poste d&#8217;injection de [&hellip;]","og_url":"https://soclema.com/les-actualites/2019/02/06/soclema-participe-a-phase-pilote-projet-tulipe/","og_site_name":"Soclema","article_published_time":"2019-02-06T13:42:34+00:00","article_modified_time":"2019-02-06T13:44:15+00:00","og_image":[{"width":250,"height":277,"url":"https://soclema.com/les-actualites/wp-content/uploads/2019/01/soclema_grtgaz_Station-pilote_Projet_TULIPE_Brouckerque-e1548326062358.jpg","type":"image/jpeg"}],"author":"Fabienne Frontière","twitter_card":"summary_large_image","twitter_misc":{"Écrit par":"Fabienne Frontière","Durée de lecture estimée":"2 minutes"},"schema":{"@context":"https://schema.org","@graph":[{"@type":"Article","@id":"https://soclema.com/les-actualites/2019/02/06/soclema-participe-a-phase-pilote-projet-tulipe/#article","isPartOf":{"@id":"https://soclema.com/les-actualites/2019/02/06/soclema-participe-a-phase-pilote-projet-tulipe/"},"author":{"name":"Fabienne Frontière","@id":"https://soclema.com/les-actualites/#/schema/person/e458f2d36ae1a6f21885f76b85591d45"},"headline":"SOCLEMA participe à la phase pilote du Projet TULIPE","datePublished":"2019-02-06T13:42:34+00:00","dateModified":"2019-02-06T13:44:15+00:00","mainEntityOfPage":{"@id":"https://soclema.com/les-actualites/2019/02/06/soclema-participe-a-phase-pilote-projet-tulipe/"},"wordCount":485,"commentCount":0,"image":{"@id":"https://soclema.com/les-actualites/2019/02/06/soclema-participe-a-phase-pilote-projet-tulipe/#primaryimage"},"thumbnailUrl":"https://soclema.com/les-actualites/wp-content/uploads/2019/01/soclema_grtgaz_Station-pilote_Projet_TULIPE_Brouckerque-e1548326062358.jpg","articleSection":["Blog"],"inLanguage":"fr-FR","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https://soclema.com/les-actualites/2019/02/06/soclema-participe-a-phase-pilote-projet-tulipe/#respond"]}]},{"@type":"WebPage","@id":"https://soclema.com/les-actualites/2019/02/06/soclema-participe-a-phase-pilote-projet-tulipe/","url":"https://soclema.com/en/news/2019/02/06/soclema-participates-in-pilot-phase-of-tulip-project/","name":"SOCLEMA participe à la phase pilote du Projet TULIPE - Soclema","isPartOf":{"@id":"https://soclema.com/les-actualites/#website"},"primaryImageOfPage":{"@id":"https://soclema.com/les-actualites/2019/02/06/soclema-participe-a-phase-pilote-projet-tulipe/#primaryimage"},"image":{"@id":"https://soclema.com/les-actualites/2019/02/06/soclema-participe-a-phase-pilote-projet-tulipe/#primaryimage"},"thumbnailUrl":"https://soclema.com/les-actualites/wp-content/uploads/2019/01/soclema_grtgaz_Station-pilote_Projet_TULIPE_Brouckerque-e1548326062358.jpg","datePublished":"2019-02-06T13:42:34+00:00","dateModified":"2019-02-06T13:44:15+00:00","author":{"@id":"https://soclema.com/les-actualites/#/schema/person/e458f2d36ae1a6f21885f76b85591d45"},"breadcrumb":{"@id":"https://soclema.com/les-actualites/2019/02/06/soclema-participe-a-phase-pilote-projet-tulipe/#breadcrumb"},"inLanguage":"fr-FR","potentialAction":[{"@type":"ReadAction","target":["https://soclema.com/les-actualites/2019/02/06/soclema-participe-a-phase-pilote-projet-tulipe/"]}]},{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https://soclema.com/les-actualites/2019/02/06/soclema-participe-a-phase-pilote-projet-tulipe/#primaryimage","url":"https://soclema.com/les-actualites/wp-content/uploads/2019/01/soclema_grtgaz_Station-pilote_Projet_TULIPE_Brouckerque-e1548326062358.jpg","contentUrl":"https://soclema.com/les-actualites/wp-content/uploads/2019/01/soclema_grtgaz_Station-pilote_Projet_TULIPE_Brouckerque-e1548326062358.jpg","width":250,"height":277,"caption":"soclema_grtgaz_Station pilote_Projet_TULIPE_Brouckerque"},{"@type":"BreadcrumbList","@id":"https://soclema.com/les-actualites/2019/02/06/soclema-participe-a-phase-pilote-projet-tulipe/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Accueil","item":"https://soclema.com/les-actualites/"},{"@type":"ListItem","position":2,"name":"SOCLEMA participe à la phase pilote du Projet TULIPE"}]},{"@type":"WebSite","@id":"https://soclema.com/les-actualites/#website","url":"https://soclema.com/en/news/","name":"Soclema","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https://soclema.com/les-actualites/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-FR"},{"@type":"Person","@id":"https://soclema.com/les-actualites/#/schema/person/e458f2d36ae1a6f21885f76b85591d45","name":"Fabienne Frontière","image":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https://soclema.com/les-actualites/#/schema/person/image/","url":"https://secure.gravatar.com/avatar/d6f5f28870cbf2756828e2f532ee86ee08af743eda5b6911ab9abe2d788a97ed?s=96&d=mm&r=g","contentUrl":"https://secure.gravatar.com/avatar/d6f5f28870cbf2756828e2f532ee86ee08af743eda5b6911ab9abe2d788a97ed?s=96&d=mm&r=g","caption":"Fabienne Frontière"}}]}},"_links":{"self":[{"href":"https://soclema.com/les-actualites/wp-json/wp/v2/posts/3776","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https://soclema.com/les-actualites/wp-json/wp/v2/posts"}],"about":[{"href":"https://soclema.com/les-actualites/wp-json/wp/v2/types/post"}],"author":[{"embeddable":true,"href":"https://soclema.com/les-actualites/wp-json/wp/v2/users/5"}],"replies":[{"embeddable":true,"href":"https://soclema.com/les-actualites/wp-json/wp/v2/comments?post=3776"}],"version-history":[{"count":12,"href":"https://soclema.com/les-actualites/wp-json/wp/v2/posts/3776/revisions"}],"predecessor-version":[{"id":3801,"href":"https://soclema.com/les-actualites/wp-json/wp/v2/posts/3776/revisions/3801"}],"wp:featuredmedia":[{"embeddable":true,"href":"https://soclema.com/les-actualites/wp-json/wp/v2/media/3777"}],"wp:attachment":[{"href":"https://soclema.com/les-actualites/wp-json/wp/v2/media?parent=3776"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https://soclema.com/les-actualites/wp-json/wp/v2/categories?post=3776"},{"taxonomy":"post_tag","embeddable":true,"href":"https://soclema.com/les-actualites/wp-json/wp/v2/tags?post=3776"}],"curies":[{"name":"wp","href":"https://api.w.org/{rel}","templated":true}]}}