{"id":7895,"date":"2024-02-22T17:08:34","date_gmt":"2024-02-22T16:08:34","guid":{"rendered":"https://soclema.com/les-actualites/?p=7895"},"modified":"2024-02-23T08:50:39","modified_gmt":"2024-02-23T07:50:39","slug":"des-equipements-soclema-installes-au-havre-pour-le-projet-fsru","status":"publish","type":"post","link":"https://soclema.com/les-actualites/2024/02/22/des-equipements-soclema-installes-au-havre-pour-le-projet-fsru/","title":{"rendered":"Des équipements SOCLEMA au Havre &#8211; Projet FSRU"},"content":{"rendered":"<p>A new LNG (Liquefied Natural Gas) import point has been installed by TotalEnergies at Le Havre, thanks to a floating terminal known as the FSRU (Floating Storage and Regasification Unit).</p>\n<p>GRTgaz managed the project to connect the FSRU to the French gas transmission system.</p>\n<p>Since October 26, 2023, the FSRU has been in service, and GRTgaz has been integrating the volumes emitted by the terminal into the French gas system. Integrating the gas into the French transmission system required injection and analysis points. In this context, SOCLEMA supplied and installed equipment for <strong>taking and conditioning samples</strong> for analysis, as well as equipment for <strong>controlling odorant injection</strong>.</p>\n<p>The sampling and injection probes installed on the tappings allow the <strong>passage of scraper pistons</strong> simply by retracting the probe, without having to touch the enclosures.</p>\n<blockquote>\n<p>Enclosures for THT injection control mounted on injection probes</p>\n<p>Gas pressure regulation enclosures mounted on GENIE sampling probes</p>\n</blockquote>\n\n\n<figure class=\"wp-block-gallery alignwide has-nested-images columns-4 is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"575\" height=\"1024\" data-id=\"7900\" src=\"https://soclema.com/les-actualites/wp-content/uploads/2024/02/soclema_GRTgaz_FSRU_le-havre-coffret-tete-de-canne-controle-injection-fermes-avec-cannes-702-IJbride-575x1024.jpg\" alt=\"soclema_GRTgaz_FSRU_le-havre-coffret-tete-de-canne-controle-injection-fermes-with-cannes-702-IJ&amp;bride\" class=\"wp-image-7900\" srcset=\"https://soclema.com/les-actualites/wp-content/uploads/2024/02/soclema_GRTgaz_FSRU_le-havre-coffret-tete-de-canne-controle-injection-fermes-avec-cannes-702-IJbride-575x1024.jpg 575w, https://soclema.com/les-actualites/wp-content/uploads/2024/02/soclema_GRTgaz_FSRU_le-havre-coffret-tete-de-canne-controle-injection-fermes-avec-cannes-702-IJbride-225x400.jpg 225w, https://soclema.com/les-actualites/wp-content/uploads/2024/02/soclema_GRTgaz_FSRU_le-havre-coffret-tete-de-canne-controle-injection-fermes-avec-cannes-702-IJbride-400x712.jpg 400w, https://soclema.com/les-actualites/wp-content/uploads/2024/02/soclema_GRTgaz_FSRU_le-havre-coffret-tete-de-canne-controle-injection-fermes-avec-cannes-702-IJbride-700x1246.jpg 700w, https://soclema.com/les-actualites/wp-content/uploads/2024/02/soclema_GRTgaz_FSRU_le-havre-coffret-tete-de-canne-controle-injection-fermes-avec-cannes-702-IJbride.jpg 708w\" sizes=\"auto, (max-width: 575px) 100vw, 575px\"><figcaption>THT Injection Control Enclosure</figcaption></figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1240\" height=\"2000\" data-id=\"7896\" src=\"https://soclema.com/les-actualites/wp-content/uploads/2024/02/soclema_GRTgaz_FSRU_le-havre-coffret-tete-de-canne-controle-injection.jpg\" alt=\"soclema_GRTgaz_FSRU_le-havre-coffret-te-de-canne-controle-injection\" class=\"wp-image-7896\" srcset=\"https://soclema.com/les-actualites/wp-content/uploads/2024/02/soclema_GRTgaz_FSRU_le-havre-coffret-tete-de-canne-controle-injection.jpg 1240w, https://soclema.com/les-actualites/wp-content/uploads/2024/02/soclema_GRTgaz_FSRU_le-havre-coffret-tete-de-canne-controle-injection-248x400.jpg 248w, https://soclema.com/les-actualites/wp-content/uploads/2024/02/soclema_GRTgaz_FSRU_le-havre-coffret-tete-de-canne-controle-injection-635x1024.jpg 635w, https://soclema.com/les-actualites/wp-content/uploads/2024/02/soclema_GRTgaz_FSRU_le-havre-coffret-tete-de-canne-controle-injection-768x1239.jpg 768w, https://soclema.com/les-actualites/wp-content/uploads/2024/02/soclema_GRTgaz_FSRU_le-havre-coffret-tete-de-canne-controle-injection-952x1536.jpg 952w, https://soclema.com/les-actualites/wp-content/uploads/2024/02/soclema_GRTgaz_FSRU_le-havre-coffret-tete-de-canne-controle-injection-400x645.jpg 400w, https://soclema.com/les-actualites/wp-content/uploads/2024/02/soclema_GRTgaz_FSRU_le-havre-coffret-tete-de-canne-controle-injection-700x1129.jpg 700w\" sizes=\"auto, (max-width: 1240px) 100vw, 1240px\"><figcaption>THT Injection Control Enclosure</figcaption></figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1305\" height=\"2000\" data-id=\"7897\" src=\"https://soclema.com/les-actualites/wp-content/uploads/2024/02/soclema_GRTgaz_FSRU_le-havre-coffret-detente-ferme-sur-canne-prelevement-702bride.jpg\" alt=\"soclema_GRTgaz_FSRU_le-havre-coffret-detente-ferme-sur-canne-prelevement-702&amp;bride\" class=\"wp-image-7897\" srcset=\"https://soclema.com/les-actualites/wp-content/uploads/2024/02/soclema_GRTgaz_FSRU_le-havre-coffret-detente-ferme-sur-canne-prelevement-702bride.jpg 1305w, https://soclema.com/les-actualites/wp-content/uploads/2024/02/soclema_GRTgaz_FSRU_le-havre-coffret-detente-ferme-sur-canne-prelevement-702bride-261x400.jpg 261w, https://soclema.com/les-actualites/wp-content/uploads/2024/02/soclema_GRTgaz_FSRU_le-havre-coffret-detente-ferme-sur-canne-prelevement-702bride-668x1024.jpg 668w, https://soclema.com/les-actualites/wp-content/uploads/2024/02/soclema_GRTgaz_FSRU_le-havre-coffret-detente-ferme-sur-canne-prelevement-702bride-768x1177.jpg 768w, https://soclema.com/les-actualites/wp-content/uploads/2024/02/soclema_GRTgaz_FSRU_le-havre-coffret-detente-ferme-sur-canne-prelevement-702bride-1002x1536.jpg 1002w, https://soclema.com/les-actualites/wp-content/uploads/2024/02/soclema_GRTgaz_FSRU_le-havre-coffret-detente-ferme-sur-canne-prelevement-702bride-400x613.jpg 400w, https://soclema.com/les-actualites/wp-content/uploads/2024/02/soclema_GRTgaz_FSRU_le-havre-coffret-detente-ferme-sur-canne-prelevement-702bride-700x1073.jpg 700w\" sizes=\"auto, (max-width: 1305px) 100vw, 1305px\"><figcaption>Gas pressure regulation enclosure before analysis</figcaption></figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1125\" height=\"2000\" data-id=\"7898\" src=\"https://soclema.com/les-actualites/wp-content/uploads/2024/02/soclema_GRTgaz_FSRU_le-havre-coffret-detente-ferme-et-canne-prelevement-702.jpg\" alt=\"soclema_GRTgaz_FSRU_le-havre-coffret-detente-ferme-et-canne-prelevement-702\" class=\"wp-image-7898\" srcset=\"https://soclema.com/les-actualites/wp-content/uploads/2024/02/soclema_GRTgaz_FSRU_le-havre-coffret-detente-ferme-et-canne-prelevement-702.jpg 1125w, https://soclema.com/les-actualites/wp-content/uploads/2024/02/soclema_GRTgaz_FSRU_le-havre-coffret-detente-ferme-et-canne-prelevement-702-225x400.jpg 225w, https://soclema.com/les-actualites/wp-content/uploads/2024/02/soclema_GRTgaz_FSRU_le-havre-coffret-detente-ferme-et-canne-prelevement-702-576x1024.jpg 576w, https://soclema.com/les-actualites/wp-content/uploads/2024/02/soclema_GRTgaz_FSRU_le-havre-coffret-detente-ferme-et-canne-prelevement-702-768x1365.jpg 768w, https://soclema.com/les-actualites/wp-content/uploads/2024/02/soclema_GRTgaz_FSRU_le-havre-coffret-detente-ferme-et-canne-prelevement-702-864x1536.jpg 864w, https://soclema.com/les-actualites/wp-content/uploads/2024/02/soclema_GRTgaz_FSRU_le-havre-coffret-detente-ferme-et-canne-prelevement-702-400x711.jpg 400w, https://soclema.com/les-actualites/wp-content/uploads/2024/02/soclema_GRTgaz_FSRU_le-havre-coffret-detente-ferme-et-canne-prelevement-702-700x1244.jpg 700w\" sizes=\"auto, (max-width: 1125px) 100vw, 1125px\"><figcaption>Conditioning enclosure mounted on GENIE 702 sampling probe</figcaption></figure>\n</figure>\n\n\n\n<p>Need more information on this equipment?</p>\n\n\n\n<div class=\"wp-block-group\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button has-custom-font-size is-style-outline is-style-outline--2\" style=\"font-size:16px\"><a class=\"wp-block-button__link has-text-color\" href=\"https://soclema.com/en/71-sample-conditioning-and-take-off-enclosures\" style=\"color:#97c222\" target=\"_blank\" rel=\"noreferrer noopener\">Click here to find out more about gas sample conditioning enclosures</a></div>\n\n\n\n<div class=\"wp-block-button has-custom-font-size is-style-outline is-style-outline--3\" style=\"font-size:16px\"><a class=\"wp-block-button__link has-text-color\" href=\"https://soclema.com/en/72-enclosures-for-odorant-injection-control\" style=\"color:#97c222\" target=\"_blank\" rel=\"noreferrer noopener\">Click here to find out more about odorant injection control enclosures</a></div>\n</div>\n</div></div>\n\n\n\n<p></p>\n","protected":false},"excerpt":{"rendered":"<p>Gas conditioning and injection control enclosures installed at the FSRU in Le Havre</p>\n","protected":false},"author":5,"featured_media":7902,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2],"tags":[],"class_list":["post-7895","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.7 - https://yoast.com/wordpress/plugins/seo/ -->\n<title>SOCLEMA equipment in Le Havre - FSRU Project - Soclema</title>\n<meta name=\"description\" content=\"Gas sample conditioning enclosures and injection control enclosures installed near the floating LNG terminal at Le Havre.\">\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\">\n<link rel=\"canonical\" href=\"https://soclema.com/en/news/2024/02/22/des-equipements-soclema-installes-au-havre-pour-le-projet-fsru/\">\n<meta property=\"og:locale\" content=\"fr_FR\">\n<meta property=\"og:type\" content=\"article\">\n<meta property=\"og:title\" content=\"SOCLEMA equipment in Le Havre - FSRU Project - Soclema\">\n<meta property=\"og:description\" content=\"Gas sample conditioning enclosures and injection control enclosures installed near the floating LNG terminal at Le Havre.\">\n<meta property=\"og:url\" content=\"https://soclema.com/en/news/2024/02/22/des-equipements-soclema-installes-au-havre-pour-le-projet-fsru/\">\n<meta property=\"og:site_name\" content=\"Soclema\">\n<meta property=\"article:published_time\" content=\"2024-02-22T16:08:34+00:00\">\n<meta property=\"article:modified_time\" content=\"2024-02-23T07:50:39+00:00\">\n<meta property=\"og:image\" content=\"https://soclema.com/les-actualites/wp-content/uploads/2024/02/Soclema_GRTgaz_FSRU_Le-Havre_Actu.jpg\">\n\t<meta property=\"og:image:width\" content=\"1200\">\n\t<meta property=\"og:image:height\" content=\"1200\">\n\t<meta property=\"og:image:type\" content=\"image/jpeg\">\n<meta name=\"author\" content=\"Fabienne Frontière\">\n<meta name=\"twitter:card\" content=\"summary_large_image\">\n<meta name=\"twitter:label1\" content=\"Écrit par\">\n\t<meta name=\"twitter:data1\" content=\"Fabienne Frontière\">\n\t<meta name=\"twitter:label2\" content=\"Durée de lecture estimée\">\n\t<meta name=\"twitter:data2\" content=\"3 minutes\">\n<script type=\"application/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https://schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https://soclema.com/en/news/2024/02/22/des-equipements-soclema-installes-au-havre-pour-le-projet-fsru/#article\",\"isPartOf\":{\"@id\":\"https://soclema.com/en/news/2024/02/22/des-equipements-soclema-installes-au-havre-pour-le-projet-fsru/\"},\"author\":{\"name\":\"Fabienne Frontière\",\"@id\":\"https://soclema.com/en/news/#/schema/person/e458f2d36ae1a6f21885f76b85591d45\"},\"headline\":\"Des équipements SOCLEMA au Havre &#8211; Projet FSRU\",\"datePublished\":\"2024-02-22T16:08:34+00:00\",\"dateModified\":\"2024-02-23T07:50:39+00:00\",\"mainEntityOfPage\":{\"@id\":\"https://soclema.com/en/news/2024/02/22/des-equipements-soclema-installes-au-havre-pour-le-projet-fsru/\"},\"wordCount\":276,\"commentCount\":0,\"image\":{\"@id\":\"https://soclema.com/en/news/2024/02/22/des-equipements-soclema-installes-au-havre-pour-le-projet-fsru/#primaryimage\"},\"thumbnailUrl\":\"https://soclema.com/les-actualites/wp-content/uploads/2024/02/Soclema_GRTgaz_FSRU_Le-Havre_Actu.jpg\",\"articleSection\":[\"Blog\"],\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https://soclema.com/en/news/2024/02/22/des-equipements-soclema-installes-au-havre-pour-le-projet-fsru/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https://soclema.com/en/news/2024/02/22/des-equipements-soclema-installes-au-havre-pour-le-projet-fsru/\",\"url\":\"https://soclema.com/en/news/2024/02/22/des-equipements-soclema-installes-au-havre-pour-le-projet-fsru/\",\"name\":\"Des équipements SOCLEMA au Havre - Projet FSRU - Soclema\",\"isPartOf\":{\"@id\":\"https://soclema.com/en/news/#website\"},\"primaryImageOfPage\":{\"@id\":\"https://soclema.com/en/news/2024/02/22/des-equipements-soclema-installes-au-havre-pour-le-projet-fsru/#primaryimage\"},\"image\":{\"@id\":\"https://soclema.com/en/news/2024/02/22/des-equipements-soclema-installes-au-havre-pour-le-projet-fsru/#primaryimage\"},\"thumbnailUrl\":\"https://soclema.com/les-actualites/wp-content/uploads/2024/02/Soclema_GRTgaz_FSRU_Le-Havre_Actu.jpg\",\"datePublished\":\"2024-02-22T16:08:34+00:00\",\"dateModified\":\"2024-02-23T07:50:39+00:00\",\"author\":{\"@id\":\"https://soclema.com/en/news/#/schema/person/e458f2d36ae1a6f21885f76b85591d45\"},\"description\":\"Gas sample conditioning enclosures and injection control enclosures installed near the floating LNG terminal at Le Havre.\",\"breadcrumb\":{\"@id\":\"https://soclema.com/en/news/2024/02/22/des-equipements-soclema-installes-au-havre-pour-le-projet-fsru/#breadcrumb\"},\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https://soclema.com/en/news/2024/02/22/des-equipements-soclema-installes-au-havre-pour-le-projet-fsru/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https://soclema.com/en/news/2024/02/22/des-equipements-soclema-installes-au-havre-pour-le-projet-fsru/#primaryimage\",\"url\":\"https://soclema.com/les-actualites/wp-content/uploads/2024/02/Soclema_GRTgaz_FSRU_Le-Havre_Actu.jpg\",\"contentUrl\":\"https://soclema.com/les-actualites/wp-content/uploads/2024/02/Soclema_GRTgaz_FSRU_Le-Havre_Actu.jpg\",\"width\":1200,\"height\":1200,\"caption\":\"Soclema_GRTgaz_FSRU_Le Havre\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https://soclema.com/en/news/2024/02/22/des-equipements-soclema-installes-au-havre-pour-le-projet-fsru/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Accueil\",\"item\":\"https://soclema.com/en/news/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Des équipements SOCLEMA au Havre &#8211; Projet FSRU\"}]},{\"@type\":\"WebSite\",\"@id\":\"https://soclema.com/en/news/#website\",\"url\":\"https://soclema.com/en/news/\",\"name\":\"Soclema\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https://soclema.com/en/news/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-FR\"},{\"@type\":\"Person\",\"@id\":\"https://soclema.com/en/news/#/schema/person/e458f2d36ae1a6f21885f76b85591d45\",\"name\":\"Fabienne Frontière\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https://soclema.com/en/news/#/schema/person/image/\",\"url\":\"https://secure.gravatar.com/avatar/d6f5f28870cbf2756828e2f532ee86ee08af743eda5b6911ab9abe2d788a97ed?s=96&d=mm&r=g\",\"contentUrl\":\"https://secure.gravatar.com/avatar/d6f5f28870cbf2756828e2f532ee86ee08af743eda5b6911ab9abe2d788a97ed?s=96&d=mm&r=g\",\"caption\":\"Fabienne Frontière\"}}]}</script>\n<!-- / Yoast SEO plugin. -->","yoast_head_json":{"title":"Des équipements SOCLEMA au Havre - Projet FSRU - Soclema","description":"Gas sample conditioning enclosures and injection control enclosures installed near the floating LNG terminal at Le Havre.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https://soclema.com/les-actualites/2024/02/22/des-equipements-soclema-installes-au-havre-pour-le-projet-fsru/","og_locale":"fr_FR","og_type":"article","og_title":"Des équipements SOCLEMA au Havre - Projet FSRU - Soclema","og_description":"Coffrets de conditionnement d'échantillons de gaz et coffrets de contrôle d'injection installés près du terminal méthanier flottant au Havre.","og_url":"https://soclema.com/les-actualites/2024/02/22/des-equipements-soclema-installes-au-havre-pour-le-projet-fsru/","og_site_name":"Soclema","article_published_time":"2024-02-22T16:08:34+00:00","article_modified_time":"2024-02-23T07:50:39+00:00","og_image":[{"width":1200,"height":1200,"url":"https://soclema.com/les-actualites/wp-content/uploads/2024/02/Soclema_GRTgaz_FSRU_Le-Havre_Actu.jpg","type":"image/jpeg"}],"author":"Fabienne Frontière","twitter_card":"summary_large_image","twitter_misc":{"Écrit par":"Fabienne Frontière","Durée de lecture estimée":"3 minutes"},"schema":{"@context":"https://schema.org","@graph":[{"@type":"Article","@id":"https://soclema.com/les-actualites/2024/02/22/des-equipements-soclema-installes-au-havre-pour-le-projet-fsru/#article","isPartOf":{"@id":"https://soclema.com/les-actualites/2024/02/22/des-equipements-soclema-installes-au-havre-pour-le-projet-fsru/"},"author":{"name":"Fabienne Frontière","@id":"https://soclema.com/les-actualites/#/schema/person/e458f2d36ae1a6f21885f76b85591d45"},"headline":"Des équipements SOCLEMA au Havre &#8211; Projet FSRU","datePublished":"2024-02-22T16:08:34+00:00","dateModified":"2024-02-23T07:50:39+00:00","mainEntityOfPage":{"@id":"https://soclema.com/les-actualites/2024/02/22/des-equipements-soclema-installes-au-havre-pour-le-projet-fsru/"},"wordCount":276,"commentCount":0,"image":{"@id":"https://soclema.com/les-actualites/2024/02/22/des-equipements-soclema-installes-au-havre-pour-le-projet-fsru/#primaryimage"},"thumbnailUrl":"https://soclema.com/les-actualites/wp-content/uploads/2024/02/Soclema_GRTgaz_FSRU_Le-Havre_Actu.jpg","articleSection":["Blog"],"inLanguage":"fr-FR","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https://soclema.com/les-actualites/2024/02/22/des-equipements-soclema-installes-au-havre-pour-le-projet-fsru/#respond"]}]},{"@type":"WebPage","@id":"https://soclema.com/les-actualites/2024/02/22/des-equipements-soclema-installes-au-havre-pour-le-projet-fsru/","url":"https://soclema.com/en/news/2024/02/22/des-equipements-soclema-installes-au-havre-pour-le-projet-fsru/","name":"Des équipements SOCLEMA au Havre - Projet FSRU - Soclema","isPartOf":{"@id":"https://soclema.com/les-actualites/#website"},"primaryImageOfPage":{"@id":"https://soclema.com/les-actualites/2024/02/22/des-equipements-soclema-installes-au-havre-pour-le-projet-fsru/#primaryimage"},"image":{"@id":"https://soclema.com/les-actualites/2024/02/22/des-equipements-soclema-installes-au-havre-pour-le-projet-fsru/#primaryimage"},"thumbnailUrl":"https://soclema.com/les-actualites/wp-content/uploads/2024/02/Soclema_GRTgaz_FSRU_Le-Havre_Actu.jpg","datePublished":"2024-02-22T16:08:34+00:00","dateModified":"2024-02-23T07:50:39+00:00","author":{"@id":"https://soclema.com/les-actualites/#/schema/person/e458f2d36ae1a6f21885f76b85591d45"},"description":"Gas sample conditioning enclosures and injection control enclosures installed near the floating LNG terminal at Le Havre.","breadcrumb":{"@id":"https://soclema.com/les-actualites/2024/02/22/des-equipements-soclema-installes-au-havre-pour-le-projet-fsru/#breadcrumb"},"inLanguage":"fr-FR","potentialAction":[{"@type":"ReadAction","target":["https://soclema.com/les-actualites/2024/02/22/des-equipements-soclema-installes-au-havre-pour-le-projet-fsru/"]}]},{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https://soclema.com/les-actualites/2024/02/22/des-equipements-soclema-installes-au-havre-pour-le-projet-fsru/#primaryimage","url":"https://soclema.com/les-actualites/wp-content/uploads/2024/02/Soclema_GRTgaz_FSRU_Le-Havre_Actu.jpg","contentUrl":"https://soclema.com/les-actualites/wp-content/uploads/2024/02/Soclema_GRTgaz_FSRU_Le-Havre_Actu.jpg","width":1200,"height":1200,"caption":"Soclema_GRTgaz_FSRU_Le Havre"},{"@type":"BreadcrumbList","@id":"https://soclema.com/les-actualites/2024/02/22/des-equipements-soclema-installes-au-havre-pour-le-projet-fsru/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Accueil","item":"https://soclema.com/les-actualites/"},{"@type":"ListItem","position":2,"name":"Des équipements SOCLEMA au Havre &#8211; Projet FSRU"}]},{"@type":"WebSite","@id":"https://soclema.com/les-actualites/#website","url":"https://soclema.com/en/news/","name":"Soclema","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https://soclema.com/les-actualites/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-FR"},{"@type":"Person","@id":"https://soclema.com/les-actualites/#/schema/person/e458f2d36ae1a6f21885f76b85591d45","name":"Fabienne Frontière","image":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https://soclema.com/les-actualites/#/schema/person/image/","url":"https://secure.gravatar.com/avatar/d6f5f28870cbf2756828e2f532ee86ee08af743eda5b6911ab9abe2d788a97ed?s=96&d=mm&r=g","contentUrl":"https://secure.gravatar.com/avatar/d6f5f28870cbf2756828e2f532ee86ee08af743eda5b6911ab9abe2d788a97ed?s=96&d=mm&r=g","caption":"Fabienne Frontière"}}]}},"_links":{"self":[{"href":"https://soclema.com/les-actualites/wp-json/wp/v2/posts/7895","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https://soclema.com/les-actualites/wp-json/wp/v2/posts"}],"about":[{"href":"https://soclema.com/les-actualites/wp-json/wp/v2/types/post"}],"author":[{"embeddable":true,"href":"https://soclema.com/les-actualites/wp-json/wp/v2/users/5"}],"replies":[{"embeddable":true,"href":"https://soclema.com/les-actualites/wp-json/wp/v2/comments?post=7895"}],"version-history":[{"count":6,"href":"https://soclema.com/les-actualites/wp-json/wp/v2/posts/7895/revisions"}],"predecessor-version":[{"id":7908,"href":"https://soclema.com/les-actualites/wp-json/wp/v2/posts/7895/revisions/7908"}],"wp:featuredmedia":[{"embeddable":true,"href":"https://soclema.com/les-actualites/wp-json/wp/v2/media/7902"}],"wp:attachment":[{"href":"https://soclema.com/les-actualites/wp-json/wp/v2/media?parent=7895"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https://soclema.com/les-actualites/wp-json/wp/v2/categories?post=7895"},{"taxonomy":"post_tag","embeddable":true,"href":"https://soclema.com/les-actualites/wp-json/wp/v2/tags?post=7895"}],"curies":[{"name":"wp","href":"https://api.w.org/{rel}","templated":true}]}}